Web app and phone app

Construction management app for the office and the site

NepalConstruct is two apps on one database. The web app runs in a browser at the office for estimates, the measurement book, running bills, accounts and settings. The phone app, built for Android and iOS, runs at the site for daily reports, attendance, stock checks, material requests and approvals.

  • Same data on web and phone
  • Nepali and English
An owner's web dashboard: order book NPR 31.00 Cr, certified NPR 14.51 Cr, NPR 2.24 Cr outstanding of which 92.00 L is overdue, 17% gross margin and an 83% collection rate
A project manager's home in the phone app: 3 of 4 sites sent today's report, one is still due, and this week's figures
Web app
Any modern browserCan be installed on a computer from the browser
Phone app
Android and iOSBuilt for both, not in the app stores yet
Without signal
Attendance, stock checks, approvalsSaved on the phone, sent when the signal returns
Language and dates
Nepali and EnglishNepali by default; BS dates in Nepali, AD in English
01 Who uses which

Which app does each person use?

Office work needs a big screen and a keyboard; site work needs a phone in one hand. Each person gets the app that fits the job, and everyone sees the same figures.

A site engineer photographing a new concrete column with a phoneAPP

Phone app: for the site

Daily reports with photos, attendance, stock counts, material requests and approvals. One app, with a home screen for each job: site, store, driver, machine operator and worker.

Both apps work from one set of data, so a report sent from the site shows at the office as soon as it is sent.

02 Web app

What can the office do in the web app?

The web app runs the whole system, from the first estimate to the last bill. These screens are from the real app, with sample data.

  • BOQ and rate analysis

    Build the BOQ by section, with quantity, unit, rate and amount, and keep each revision.

    Estimates & tenders
    The BOQ editor in the web app: the Bharatpur Health Post estimate by section, with quantity, unit, rate and amount for each item, and its revisions alongside
  • Running bills

    Each bill's gross work value, VAT, TDS, retention and net payable, and the advance recovered so far.

    Measurement & billing
    Four running bills of one contract in the web app: gross work value, VAT, TDS, retention and net payable for each, and the mobilisation advance recovered so far
  • Daily report review

    The report sent from the phone, with its workers, work lines and two review steps.

    Site operations
    A site engineer's sent daily progress report on the web: status Submitted, workers and work lines, and its two review steps, a recommendation at site and head office approval
  • Stock and store

    Each material's quantity, average rate, value and stock card.

    Materials & store
    The Stock tab of the web app's Materials page: each material's quantity, average rate, value and stock card
  • Approval routes

    Who approves what by amount band, and which step a request skips and why.

    Approvals & organisation
    Settings, Roles and approvals in the web app: a NPR 6,50,000 material requisition raised by Ramesh Thapa goes first to Suman Shrestha, skips the procurement step because it is not over the BOQ material budget, and ends with Prakash Adhikari on the step from NPR 5,00,000
  • Project margins

    Order book, certified revenue, direct cost and gross margin for each project.

    Analytics
    The project health table on the web dashboard: four projects with order book, certified revenue, billed percent, direct cost, gross margin and margin percent

Screens show sample data.

03 Phone app

What can the site do on the phone?

A home screen for each job, in Nepali by default. Site staff log in with a phone number and a PIN.

  1. A site engineer's Today screen in the phone app: 3 of 5 parts of today's report filled, this week's reports, attendance and goods received
    01

    Today

    What is left of today's report, this week's reports, attendance and goods received.

  2. Today's daily report on the phone: work done and photos still to fill, workers, material and machine hours filled, and the send button
    02

    Daily report

    Work against BOQ items, workers, material, machine hours and photos, then send.

  3. Today's attendance on the phone: workers marked present or half day, overtime hours, and the save button
    03

    Attendance

    Present or half day, with overtime hours. Saves without signal.

  4. Checking the sand on the phone: what the records say is left, and the pile measured by its sizes in metres
    04

    Stock check

    Count what is left, or measure a sand pile in metres, against the records.

  5. A purchase order on the phone: from Dipak Poudel, NPR 4,83,000.00, the approval step waiting for you, and two supporting documents, both opened
    05

    Approve a purchase order

    Open the supporting documents, then decide. If the signal drops, the decision waits on the phone.

  6. The phone's Money screen: 2.24 Cr to collect from 4 clients, 92.00 L overdue, and what is owed by age and by client
    06

    Money to collect

    What each client owes and for how long, for the owner and accounts.

04 Compared

Which work happens on the web, and which on the phone?

Both apps work from the same records. The site's work happens on the phone; the office's work stays on the web.

Web app and phone app, task by task
TaskWeb appPhone app
Estimates, BOQ and rate analysisBuild and reviseNot on the phone
Tenders and bid eligibilityCheck and prepareNot on the phone
Measurement bookRecord and checkNot on the phone
Running bills: VAT, TDS, retentionPrepare and checkMoney to collect only
Daily progress reportReview and sign offFill in and send; sending needs signal
AttendanceSee the attendance cardsMark it, also without signal
Daily stock checkReview the gapsCount and measure, also without signal
Material requestsRaise, source and approveRaise and approve
ApprovalsEvery documentDecide, also without signal
Driver and machine day logsLogsheets and reportsDriver days, also without signal
Settings, roles and approval routesSet them upNot on the phone
05 Offline

What works on the phone without signal?

Hill sites lose signal. The phone app keeps this work on the phone and sends it by itself when the signal returns, so nobody types it in again.

A store keeper counting cement bags in a site store, with rebar bundles and bricks nearby
  • Attendance

    Workers present or half day, with overtime.

  • Daily stock checks

    Counts or measures, with live photos and a short video as proof.

  • Site visit notes

    What you saw on a site visit.

  • Approval decisions

    A decision made on the road is sent when the signal returns.

  • Driver days

    The driver's day, for the logsheet.

  • The last figures

    The figures saved last time stay readable.

  • The daily report needs signal to send

    Unsaved edits stay on the phone if the app closes, but sending needs the server.

06 Together

How do the phone and the web work together?

One daily report, followed from the site to head office. The recording is the real phone app with sample data.

One report, four steps

  1. 01

    Site engineerPhone

    Sends the day's report

    Work against BOQ items, workers, materials, machine hours and photos. Once it is sent, its photos can no longer be swapped or deleted.

  2. 02

    Project managerPhone or web

    Checks it for the site

    Reads the report and recommends it to head office.

  3. 03

    Head officeWeb or phone

    Signs it off

    Approves the report and locks it, so it can no longer change.

  4. 04

    OwnerWeb and phone

    Sees the progress

    Progress against the BOQ is worked out from the reported quantities, never typed in by hand.

07 FAQ

Questions people ask

Short answers, about what is built today.

01What is the NepalConstruct app?

NepalConstruct is construction management software for Nepali contractors that comes as two apps. The web app runs in a browser for office work such as estimates, running bills and accounts. The phone app, built for Android and iOS, is for site work: daily reports, attendance, stock checks and approvals.

02Can I download the phone app from Google Play or the App Store?

Not yet. The phone app is built for Android and iOS, but it is not in the app stores yet. Book a demo to see it working on a phone. The web app also works in a phone's browser.

03Does the phone app work without internet?

Partly. Attendance, daily stock checks with photo and video proof, site visit notes, approval decisions and driver days are saved on the phone and sent when the signal returns. The last saved figures stay readable too. The daily report needs a connection to send, but unsaved edits stay on the phone.

04Do the office and the site see the same figures?

Yes. Both apps read and write the same database, so the owner, the accountant and the site engineer see the same numbers. The phone never works out money on its own: amounts come from the server, and progress is worked out from the reported quantities against the BOQ.

05Who in the firm can use the phone app?

Everyone, each with their own home screen: owner, office staff, project manager, site engineer, store keeper, HR, driver, machine operator and worker. Site staff log in with a phone number and a PIN, office staff with their email. What each person sees follows the role the firm gives them.

06What happens if a phone with the app is lost?

The app lock is on by default, so the app asks for Face ID or the phone's own lock. Two-step sign-in with an authenticator app is optional, a PIN locks after repeated wrong tries, and you can sign out of every device at once.

07Are both apps in Nepali?

Yes. Every screen of the web app and the phone app is in Nepali and English, and both open in Nepali by default. Dates follow the language: Bikram Sambat in Nepali, AD in English. Fiscal years, which run from Shrawan to Ashadh, and attendance months always use Bikram Sambat.

Something else to ask?

We answer against how your firm works.

Ask us
08 Start today

Start estimating the same day

Set up your company profile, a few projects and roles, and start estimating the same day. Or book a demo and see it on a sample firm first.

A hard hat, rolled drawings and a laptop on a table in front of a concrete-frame building under construction at sunset, with a crane, the city and snow peaks behind