Settings & roles

Settings, roles and permissions for construction firms in Nepal

NepalConstruct keeps VAT, TDS, overhead, wastage, minimum wage, SSF and district rates as dated settings, so each estimate, bill and payroll reads the rate in force on its date. Construction roles come ready or you add your own, and the owner or admin picks the sections, actions and projects each person gets. Every screen is in Nepali and English.

  • Web app
  • Nepali and English
  • BS or AD dates, by language
Two people at a table signing a contract, a hard hat next to the papers and the building site outside the window
Who sets it up
The owner or adminEveryone else sees what they are given
Roles
19 company roles plus owner15 project roles, and your own
Dated settings
VAT, TDS, overhead, wastageAlso minimum wage, SSF and overtime rules
Language and dates
Nepali and EnglishBikram Sambat and AD dates
01 What it does

What do settings and roles do?

They hold the rules your firm works by and decide who may use what. A rate changes from a date instead of being typed over, and each person opens only the sections they need.

01Dated settings

Rates and rules with a start date

VAT, TDS, overhead and profit, wastage per material, minimum wage, SSF and the working hours and overtime rules are settings with an effective-from date, not numbers typed into a sheet. District rates are kept per district and fiscal year, and the DUDBC and DoR norms are built in. Estimates, bills and payroll read their rates from here.

  • Each setting shows the rate in effect now
  • Your firm sets its own wastage per material
  • Five limits are still in the code; the FAQ lists them
Guide: Rate analysis in Nepal

02Rate history

A new rate starts on its own date

When a rate changes, a new row is added with the date it starts, and the old row stays in the list. A rate analysis dated before the change still reads the old figure, and each running bill keeps the VAT and TDS rates it was worked out with. A rule change does not rewrite an old bill.

  • Earlier rows stay, with their start dates
  • Your firm's own rows show apart from the defaults
  • Each running bill keeps the rates it used
Guide: TDS on contract payments

03Roles

Construction roles ready, and your own

Start with 19 company roles plus the owner, such as general manager, accountant, estimator, store manager and HR head, and 15 project roles, such as project manager, site engineer, store keeper and foreman. Rename a built-in role, change what it can do, hide it, or add roles of your own.

  • Project roles are given per project
  • A role change reaches everyone not given custom access
  • Reset a built-in role to its default at any time

04Access

Sections and actions per person

The role fills in the defaults, then the owner or admin picks the sections, actions and projects for each person. A section that is off is hidden from that person, its pages say the firm's owner or admin has not given it, and the server refuses it too. No one can pass on access they do not have themselves.

  • Six sections to give or hold back
  • All projects, or only the ones they are added to
  • Owner and admin access is never limited
02 Compared

How is it different from an Excel template?

The same rates and the same team, kept two ways.

A firm's rates and access kept in an Excel template, compared with the same in NepalConstruct.
TopicExcel template, rates in cellsKept by hand in each fileNepalConstructRead from dated settings and roles
A rate changeEach copy of the template is edited by handOne new row from its start date; earlier rows stay
Which rate a bill usedFound by opening the file it was made in, if it was keptKept on the bill itself
Who can change a rateAnyone who can edit the file, unless the sheet is lockedOnly people given the settings permission
Who sees whatWhoever gets the file sees all of itEach person sees the sections you give them
Language and datesWhatever the template's author typedEvery screen in Nepali or English, with BS or AD dates to match
03 Nepal rules

Which Nepal rules sit in the settings?

Most rule values live in dated settings. Five limits are still fixed in the code, and we say which ones.

An accountant putting ledger binders back on the office shelf at the end of the day
VAT and TDS
VAT 13% and TDS 1.5% on works contracts, read from dated tax settings. The Rs 50,000 TDS threshold is stored with the rate but not applied yet, so check small bills with your tax adviser.Guide: TDS on contract payments
Minimum wage and SSF
Minimum wage, SSF shares and overtime rules are dated settings that payroll checks against.Guide: Minimum wage 2082/83
Overhead and wastage
Overhead and profit, and wastage per material, carry the date they start.Guide: Rate analysis in Nepal
District rates and norms
District rates per fiscal year, with the DUDBC building and DoR road and bridge norms built in.
Bikram Sambat and fiscal years
Bikram Sambat and AD dates, and Nepal fiscal years that start on 1 Shrawan.
Five limits still in the code
The five active project limit, the 30% low quote flag, the price adjustment cap, the variation tiers and the worker insurance minimums are not settings yet.
04 Step by step

How do you set it up for your firm?

Five steps, done once and changed whenever the firm changes.

  1. 01

    Check the rates in effect

    Open Settings and read the VAT, TDS, overhead and wastage in force today, each with its start date. Set your own wastage per material.

  2. 02

    Upload district rates

    Upload the rate sheet for each district and fiscal year you price work in.

  3. 03

    Shape the roles

    Keep the built-in company and project roles, rename or retune them, hide the ones you do not use, or add your own.

  4. 04

    Add the team

    Add each person with a company role. The role fills in their sections, actions and projects, and you can change any of them.

  5. 05

    Staff each project

    On a project's People tab, give each person a project role, such as site engineer, store keeper or foreman.

05 Where it fits

Which steps does it sit under?

All eight. Settings and roles sit under the whole job: from the estimate to the ledger, each step follows the same dated settings, and each person works only in the steps their access allows.

Win the work

Run the site

Get paid

  1. 01EstimateBOQ ready
  2. 02TenderBid submitted
  3. 03ContractContract signed
  4. 04Daily site reportDPR filed
  5. 05Materials & storeStock reconciled
  6. 06Measurement bookMB certified
  7. 07Running billIPC ready to certify
  8. 08Ledger & reportsBooks balanced
06 Who uses it

Who looks after it?

One person sets the rules; everyone else works inside them.

A site engineer at a desk working out an estimate from drawings, with a scale ruler and a calculator
  • Company owner / MD

    Decides the roles, gives each person their sections and checks the rates the firm works with.

    See the role page
  • Accountant

    Reads the VAT, TDS, minimum wage and SSF in force before bills and payroll go out.

    See the role page
  • Project manager

    Sees the projects they are added to and the sections the owner has given them.

    See the role page
07 FAQ

Questions people ask

Short answers, about what is built today.

01What is a dated setting?

A dated setting is a rate or rule stored with the date it starts, such as VAT, a wastage allowance or the minimum wage. When it changes, a new row is added and the old one stays. Each estimate, bill or payroll then reads the value in force on its own date.

02Can we make our own roles?

Yes. Add a role with the name your firm uses and choose its sections, actions and project access. You can also rename a built-in role, change what it can do, hide it, or reset it to the default. Project roles work the same way, and each person gets theirs per project.

03Is every rule value a setting, or are some in the code?

Not all of them yet. VAT, TDS, overhead, wastage, minimum wage, SSF, overtime rules, district rates and norms are dated settings. Five limits are still fixed in the code: the five active project limit, the 30% low quote flag, the price adjustment cap, the variation approval tiers and the worker insurance minimums.

04What happens to old bills when a rate changes?

Nothing. A new rate is added as a new row from the date it starts, and the earlier row stays in the list. Each running bill keeps the VAT and TDS rates it was worked out with, so a bill certified last year still shows last year's figures.

05Can I hide finance from site staff?

Yes. The owner or admin picks the sections each person gets: projects and site, estimates and contracts, finance, petty cash, plant and assets, and reports. A section that is off leaves that person's menu, its pages say it has not been given, and the server refuses it as well.

06Is our firm's data kept apart from other firms?

Yes. The database itself keeps each firm's data apart: on every request it returns only the rows of the firm that asked. That rule sits inside the database, on top of the permission checks in the app, and our security page explains how it works.

07Does it work in Nepali, with Bikram Sambat dates?

Yes. Every screen of the web app and the phone app is in Nepali and English, and both apps open in Nepali. Dates read in Bikram Sambat on Nepali screens and in AD on English ones, and fiscal years follow Nepal's year from Shrawan to Ashadh.

Something else to ask?

We answer against how your firm works.

Ask us