Payroll & compliance

Construction payroll software for Nepal, from hajiri to SSF

NepalConstruct runs payroll for construction sites in Nepal. The foreman marks hajiri on the phone, even without signal, and the system works out each worker's wage and overtime. The project manager approves the card, someone else pays it once, and payroll runs work out SSF employee and employer shares on basic pay from dated settings.

  • Web app
  • Phone app for site staff
  • Nepali and English
A site engineer on a building site taking a phone photo of a freshly cast concrete column
Who uses it
Accountants, HR, foremen, PMsWorkers see their own month
Hajiri
On the foreman's phoneSaved without signal, sent later
SSF
Employee and employer sharesOn basic pay, from dated settings
Checks
Minimum wage and overtimeLimits read from dated settings
01 What it does

What does payroll and hajiri replace?

The paper hajiri card, the month-end calculator and the SSF sheet. Each wage comes from the card and your dated settings, not from one person's word or memory.

01 / 04

The hajiri card on the foreman's phone

Each worker has one card per site and Bikram Sambat month, laid out like the paper one: name, naike, post and the day or hour rate. The foreman marks every day as present, half day or absent, with any overtime hours. Marks are saved on the phone first and reach the office when the signal returns.

  • Present, half day, absent and overtime hours
  • Cards paid by the day or by the hour
  • No second card for the same worker, site and month
02 / 04

The wage worked out from the card

The system multiplies the days or hours on the card by its rate, adds overtime at the rate in your labour settings and takes off the advance given that month. A card with a problem, such as overtime over a limit or an advance bigger than the wage, cannot be sent until it is fixed. The worker sees the same month on their own phone.

  • Overtime from the standard hours and rate in settings
  • A rate below the minimum wage is flagged
  • Workers log in with a phone number and PIN
Guide: Minimum wage in Nepal 2082/83
03 / 04

Payroll runs with SSF on basic pay

For staff on the register, a payroll run works out basic pay and dearness allowance for the days worked, overtime, the SSF employee and employer shares on basic pay, and the advance to recover. Every rate is read from the dated setting in force on the run date. The person who built the run cannot finalise it.

  • SSF only for workers enrolled in SSF
  • Pay below the minimum wage flagged on the line
  • A missing setting stops the run; nothing is guessed
Guide: SSF for construction workers
04 / 04

Org chart, approval cover and manpower requests

Set up departments, positions and who reports to whom. When a manager is away, their approvals go to a colleague for the dates you set. Sites ask for workers by trade, number and days, and HR decides. Workers sit in one register with their insurance details and a citizenship card photo that only HR can open.

  • Departments, positions and reporting lines
  • Approvals handed over for a set period
  • Every manpower request goes through an approval chain
02 Step by step

How does a hajiri card become a paid wage?

Six steps from the first day on site to the wage in hand.

  1. 01

    Register the worker

    HR adds the worker with the post, the day or hour rate, the SSF number if enrolled and a citizenship card photo.

  2. 02

    Mark hajiri every day

    The foreman marks present, half day, absent and overtime on the phone. With no signal, the marks wait on the phone.

  3. 03

    Send the card

    At month end the card goes for approval with the wage worked out. Overtime over a limit or an advance above the wage must be fixed first.

  4. 04

    The PM approves

    The project manager approves. Nobody who opened or edited the card can, and the approved figures are frozen.

  5. 05

    Pay it once

    Someone other than the approver records the payment in cash or by bank. A card cannot be paid twice.

  6. 06

    The worker checks the month

    The worker logs in with a phone number and PIN and sees the days counted, the wage, the advance and the take-home.

03 Nepal rules

How are SSF and labour rules kept current?

Each rate and limit is a dated setting. A new notice changes the next card or run, never a card that is already approved.

An accountant putting ledger binders back on the office shelf as the day ends
SSF shares
Social Security Fund employee and employer shares on basic pay, from a dated setting, for workers enrolled in SSF.Guide: SSF for construction workers
Minimum wage
The daily minimum wage is a dated setting. A rate below it is flagged on the card and the payroll line.Guide: Minimum wage in Nepal 2082/83
Working hours and overtime
Standard hours, the overtime rate and the daily and weekly overtime limits are settings you keep in line with the Labour Act 2074. A card over a limit cannot be sent.
Maker is never checker
Nobody who opened or edited a card can approve it, and whoever built a payroll run cannot finalise it.
Approved means frozen
An approved card keeps its figures, even when a rate or rule changes later.
Paid once, by someone else
The approver cannot pay the card, and a card is paid only once, even if the request is sent twice.
04 Compared

What changes from the paper muster roll?

One month's wages, kept two ways.

Hajiri and wages kept on a paper muster roll and in Excel, compared with NepalConstruct.
TopicPaper muster roll and ExcelWritten and added up by handNepalConstructWorked out from the card and dated settings
HajiriOn a paper card, often on the naike's wordMarked by the foreman on the phone, day by day
No signal on sitePaper works anywhere, but the office sees it only at month endMarks are saved on the phone and sent when the signal returns
Wage and overtimeAdded up on a calculator or in a sheet formulaWorked out from the days, the rate and your labour settings
SSF and minimum wageChecked against the latest notice by handRead from dated settings; a rate below the minimum is flagged
Approval and paymentOne person can write, approve and pay the same cardThe PM approves, the card is frozen, someone else pays it once
What the worker seesHas to ask the naike or the officeTheir own month on their own phone
05 Where it fits

Which step of the whole job is this?

Hajiri is kept on site every day, alongside the daily site report. The wage that comes out of it is what the office pays at month end.

Win the work

  1. EstimateBOQ ready
  2. TenderBid submitted
  3. ContractContract signed

Run the site

  1. Daily site reportDPR filed
  2. Materials & storeStock reconciled

Get paid

  1. Measurement bookMB certified
  2. Running billIPC ready to certify
  3. Ledger & reportsBooks balanced
06 Who uses it

Who does which part?

One wage, checked by three people.

Two people signing papers at a table, a hard hat next to them and the building site outside the window
  • Site engineer / foreman

    Marks hajiri on the phone every day, signal or not, and sends the cards at month end.

    See the role page
  • Project manager

    Approves the hajiri cards for the site and asks HR for workers when the work needs more.

    See the role page
  • Accountant

    Builds the payroll run and pays approved cards. Someone else finalises the run.

    See the role page
07 FAQ

Questions people ask

Short answers, about what is built today.

01What is a hajiri card?

Hajiri is the daily attendance of site workers. A hajiri card holds one worker's days on one site for one Bikram Sambat month: present, half day or absent, with any overtime hours. In NepalConstruct the foreman marks it on the phone, the system works out the wage, and the project manager approves the card.

02Does NepalConstruct work out SSF for construction workers?

Yes. For each worker enrolled in SSF, the payroll run works out the employee and employer shares on basic pay. The share rates are a dated setting you keep up to date, so a change only affects runs dated after it. Our SSF guide explains who pays what.

03Can it export the SSF schedule or file it with SSF?

Not yet. Each run works out every worker's SSF shares, and the payroll report downloads as a CSV summary of the run, but there is no SSF schedule file and nothing is sent to SSF. You still file your contributions with SSF yourself.

04Does the hajiri app work without mobile signal?

Yes, for marking. The foreman's marks for present, half day, absent and overtime are saved on the phone first and sent when the signal returns, so a site with weak signal still keeps a full card. The phone app is built for Android and iOS.

05How are overtime and the minimum wage checked?

Standard hours, the overtime rate, the daily and weekly overtime limits and the minimum wage are all dated settings. Overtime is paid from them, a card over a limit cannot be sent, and a rate below the minimum wage is flagged. Our minimum wage guide explains the 2082/83 figures.

06Does it manage leave or leave balances?

Not yet. There are no leave requests or leave balances. What exists is approval cover: a manager can hand their approvals to a colleague for set dates, and each decision records that it was made for them. Departments, positions and reporting lines live in the org chart.

07Can a worker see their own pay?

Yes. A worker logs in to the phone app with a phone number and a PIN set by HR, and sees the month: how they are paid, the days or hours counted, what they earned, the advance and the take-home, card by card for each site.

08Does payroll post to the accounts ledger?

Not yet. Finalising a payroll run marks it as final, but it posts no entries to the ledger, so for now your accountant enters payroll in the books. The payroll report downloads as a CSV with each run's gross, SSF and net totals.

Something else to ask?

We answer against how your firm works.

Ask us