Running bill (IPC) software for contractors, from the measurement book
NepalConstruct builds each running bill (IPC) from the jointly signed measurement book, priced at the contract's BOQ rates frozen at award. It works out price adjustment, VAT, TDS, retention, advance recovery and LD in whole paisa, routes the bill for the PM to recommend and a senior manager to approve, then posts it to the books once.
QS, PMs, accountantsA senior manager approves each bill
Quantities from
The signed MBTyped quantities are refused
Worked out
VAT, TDS, retention, LDPlus price adjustment and advance recovery, to the paisa
In the books
One balanced postingCertify twice, still posted once
01 Where it fits
Which steps of the job does billing cover?
It covers the measurement book and the running bill. Items and rates arrive from the contract, and each certified bill goes on to the ledger and the reports.
Win the work
Run the site
Get paid
01EstimateBOQ ready
02TenderBid submitted
03ContractContract signed
04Daily site reportDPR filed
05Materials & storeStock reconciled
06Measurement bookMB certified
07Running billIPC ready to certify
08Ledger & reportsBooks balanced
02 What it does
What work does the billing module replace?
It replaces the measurement book copied into Excel and the deduction sheet, and posts each bill once to its own ledger. Quantities, deductions and postings come from one record, so the bill, the MB and the app's ledger match.
01IPC deductions
The IPC deduction order, worked out
Gross work done is this bill's signed quantity times the rate of record. Price adjustment is added, VAT and TDS are worked out on that adjusted value, and retention, advance recovery and LD come off after tax. Every figure is in whole paisa, and each bill keeps the rates it used.
Advance recovery stops at what is still outstanding
LD never takes a bill below zero; the rest comes off the next bill
VAT and TDS rates from dated tax settings, unless the contract sets its own TDS rate
Sample data. In the app each rate comes from dated settings or the contract.
02Measurement book
A measurement book both sides sign
Each entry records nos x length x breadth x depth against a BOQ item, and counts only once both sides have signed it. Entries cannot be edited or deleted; a correction is a new entry. The running bill takes its quantities from these signed entries, and once a contract has an MB, typed quantities are refused.
An unsigned entry stays out of the bill
Quantity worked out from the dimensions, not typed
This bill's quantity: the signed total less earlier bills
ABCDEFMB entryBOQ item, locationNosL x B x D, mQty, m3Signed413.1 columns, ground floor grid A120.40 x 0.40 x 3.005.76Both sides423.1 columns, ground floor grid B80.45 x 0.45 x 3.004.86Both sides433.1 columns, first floor grid A120.40 x 0.40 x 3.005.76Waiting
Goes into the bill
Signed entries only: 10.62 m3
Data
Sample data
03Contract terms
Variations, price adjustment and LD on the contract's terms
Each contract carries its own retention, mobilisation advance and recovery %, LD and price adjustment terms. Approved variations show as a running % of the contract value, with the approval level that share needs. Price adjustment follows the Pn formula on your index series, and LD is worked out from the days of delay and taken bill by bill.
BOQ rates frozen at award
Price adjustment stops at 25% of the contract value in total, a limit fixed in the software today
Adjustment on a gross of 20,00,000, (Pn - 1) x gross40,000.00
Indices against a base of 100: labour 104, material 102, equipment 100. Sample data.
04Approve and post
Recommend, approve, certify, post once
The bill travels a chain: the project's PM recommends it after checking the quantities against the MB and daily reports, then the preparer's senior manager approves it. On that approval the bill is certified and its figures are locked. It posts one balanced double-entry set, and pressing certify twice never posts twice.
A starter chain your firm can change
No senior manager on the org chart: the owner approves
Ledger entries cannot be edited or deleted
IPC 4, school building
MB entries signed by both sidesDone
PM recommendsQuantities checked
Senior manager approvesWaiting
Certified, figures lockedOn final approval
Posted to the ledgerOnce, balanced
Typed quantities refused: this contract bills from its MB
Certify pressed twice: still one posting
03 Step by step
How does a running bill move from tape to ledger?
Six steps, from the contract terms to a posted bill.
01
Start from the contract
The bill uses the contract's BOQ rates, frozen at award, and its own retention, advance recovery, LD and price adjustment terms.
02
Measure and sign in the MB
Enter nos x L x B x D against each BOQ item. An entry counts once both sides have signed it.
03
Prepare the running bill
This bill's quantity is the signed total less what earlier bills took, priced at the rate of record.
04
The PM recommends
The project manager checks the billed quantities against the MB and the daily reports.
05
A senior manager approves, the bill is certified
On final approval, price adjustment, VAT, TDS, retention, advance recovery and LD are worked out and the figures lock.
06
Posted once
One balanced double-entry set goes to the ledger: net payable, TDS withheld, retention held, advance recovered and LD.
04 Compared
How is it different from an Excel bill?
One IPC, prepared in Excel and in NepalConstruct.
A running bill prepared in an Excel sheet from the MB pages, compared with the same bill in NepalConstruct.
Topic
Excel sheetFlexible, but typed and checked by hand
NepalConstructWorked out from the MB and the contract
Quantities
Copied by hand from the MB pages
Read from MB entries both sides signed
Earlier bills
Previous quantities carried over from the last sheet
What earlier bills took is subtracted for you
Deductions
Cell formulas that one edit can break
A fixed order, worked out in whole paisa
Advance recovery
The outstanding advance tracked in another sheet
Stops at what is still outstanding
Sign-off
Signatures on a printout
PM recommends, a senior manager approves, then the figures lock
The books
Typed again by the accountant
Posted once to the app's ledger; your accountant still enters it in Tally
05 Nepal rules
Which billing rules are built in?
VAT and TDS are dated settings, retention, advance and LD terms sit on each contract, and every bill keeps the rates it used.
Joint measurement
An MB entry counts only once both sides have signed it, and it can never be rewritten.
Pn = A + b(Ln/Lo) + c(Mn/Mo) + d(En/Eo) from your index series. The app stops the total adjustment at 25% of the contract value; this limit is fixed in the software today.
A running bill, or interim payment certificate (IPC), is the contractor's bill for the work done so far on a contract. It prices the measured quantity at the contract's BOQ rates, then takes off deductions such as retention, advance recovery and tax. Each bill is certified before it is paid.
02Is the running bill made from the measurement book?
Yes. Once a contract has a measurement book, the running bill takes its quantities only from entries both sides have signed, and typed quantities are refused. Each bill's quantity is the signed total less what earlier bills took, priced at the BOQ rate frozen at award.
Price adjustment, VAT, TDS, retention, mobilisation advance recovery and LD. VAT and TDS are worked out on the certified value after price adjustment; retention, advance recovery and LD come off after tax. Every amount is in whole paisa, and each bill keeps the rates it used.
04Are the VAT, TDS and retention rates fixed in the software?
No. VAT and TDS come from dated tax settings, and retention, advance recovery, LD and price adjustment terms are set on each contract. One exception: the 25% price adjustment cap is still fixed in the software. When a rate changes, new bills use the new rate and certified bills keep the one they used. Confirm current rates with your tax adviser.
Not yet. The measurement book is in the web app only. The phone app covers daily reports, attendance, stock checks and approvals, so the site records its work there, and measurement book entries are made and signed on the web.
06Is this retail billing software, or construction billing software for RA bills?
It is construction billing software for contractors. It builds the running account (RA) bill, also called the interim payment certificate (IPC), from measured work. It is not a shop billing app, though a certified bill can become a VAT tax invoice with a gap-free number.
07Does it send bills to CBMS or IRD?
Not yet. From a certified bill you can issue a VAT tax invoice with a gap-free number that cannot be changed afterwards, but sending invoices to CBMS is not live yet; it is coming. Until then, file with IRD the way you do today.
08Does it keep track of variation orders?
Yes. Approved variations add up to a running % of the contract value, and each order records the approval level that share needs. Today the approval itself is a single step by someone allowed to certify bills, not a chain that follows the level.