Measurement & billing

Running bill (IPC) software for contractors, from the measurement book

NepalConstruct builds each running bill (IPC) from the jointly signed measurement book, priced at the contract's BOQ rates frozen at award. It works out price adjustment, VAT, TDS, retention, advance recovery and LD in whole paisa, routes the bill for the PM to recommend and a senior manager to approve, then posts it to the books once.

  • Web app
  • Nepali and English
A running bill checked line by line against the measurement book, with a calculator and a stamped bill file beside it
Used by
QS, PMs, accountantsA senior manager approves each bill
Quantities from
The signed MBTyped quantities are refused
Worked out
VAT, TDS, retention, LDPlus price adjustment and advance recovery, to the paisa
In the books
One balanced postingCertify twice, still posted once
01 Where it fits

Which steps of the job does billing cover?

It covers the measurement book and the running bill. Items and rates arrive from the contract, and each certified bill goes on to the ledger and the reports.

Win the work

Run the site

Get paid

  1. 01EstimateBOQ ready
  2. 02TenderBid submitted
  3. 03ContractContract signed
  4. 04Daily site reportDPR filed
  5. 05Materials & storeStock reconciled
  6. 06Measurement bookMB certified
  7. 07Running billIPC ready to certify
  8. 08Ledger & reportsBooks balanced
02 What it does

What work does the billing module replace?

It replaces the measurement book copied into Excel and the deduction sheet, and posts each bill once to its own ledger. Quantities, deductions and postings come from one record, so the bill, the MB and the app's ledger match.

01IPC deductions

The IPC deduction order, worked out

Gross work done is this bill's signed quantity times the rate of record. Price adjustment is added, VAT and TDS are worked out on that adjusted value, and retention, advance recovery and LD come off after tax. Every figure is in whole paisa, and each bill keeps the rates it used.

  • Advance recovery stops at what is still outstanding
  • LD never takes a bill below zero; the rest comes off the next bill
  • VAT and TDS rates from dated tax settings, unless the contract sets its own TDS rate
Guide: How a running bill (IPC) is worked out

02Measurement book

A measurement book both sides sign

Each entry records nos x length x breadth x depth against a BOQ item, and counts only once both sides have signed it. Entries cannot be edited or deleted; a correction is a new entry. The running bill takes its quantities from these signed entries, and once a contract has an MB, typed quantities are refused.

  • An unsigned entry stays out of the bill
  • Quantity worked out from the dimensions, not typed
  • This bill's quantity: the signed total less earlier bills
Guide: The measurement book in Nepal

03Contract terms

Variations, price adjustment and LD on the contract's terms

Each contract carries its own retention, mobilisation advance and recovery %, LD and price adjustment terms. Approved variations show as a running % of the contract value, with the approval level that share needs. Price adjustment follows the Pn formula on your index series, and LD is worked out from the days of delay and taken bill by bill.

  • BOQ rates frozen at award
  • Price adjustment stops at 25% of the contract value in total, a limit fixed in the software today
  • LD never passes the cap set in the contract
Guide: The price adjustment formula

04Approve and post

Recommend, approve, certify, post once

The bill travels a chain: the project's PM recommends it after checking the quantities against the MB and daily reports, then the preparer's senior manager approves it. On that approval the bill is certified and its figures are locked. It posts one balanced double-entry set, and pressing certify twice never posts twice.

  • A starter chain your firm can change
  • No senior manager on the org chart: the owner approves
  • Ledger entries cannot be edited or deleted
03 Step by step

How does a running bill move from tape to ledger?

Six steps, from the contract terms to a posted bill.

  1. 01

    Start from the contract

    The bill uses the contract's BOQ rates, frozen at award, and its own retention, advance recovery, LD and price adjustment terms.

  2. 02

    Measure and sign in the MB

    Enter nos x L x B x D against each BOQ item. An entry counts once both sides have signed it.

  3. 03

    Prepare the running bill

    This bill's quantity is the signed total less what earlier bills took, priced at the rate of record.

  4. 04

    The PM recommends

    The project manager checks the billed quantities against the MB and the daily reports.

  5. 05

    A senior manager approves, the bill is certified

    On final approval, price adjustment, VAT, TDS, retention, advance recovery and LD are worked out and the figures lock.

  6. 06

    Posted once

    One balanced double-entry set goes to the ledger: net payable, TDS withheld, retention held, advance recovered and LD.

04 Compared

How is it different from an Excel bill?

One IPC, prepared in Excel and in NepalConstruct.

A running bill prepared in an Excel sheet from the MB pages, compared with the same bill in NepalConstruct.
TopicExcel sheetFlexible, but typed and checked by handNepalConstructWorked out from the MB and the contract
QuantitiesCopied by hand from the MB pagesRead from MB entries both sides signed
Earlier billsPrevious quantities carried over from the last sheetWhat earlier bills took is subtracted for you
DeductionsCell formulas that one edit can breakA fixed order, worked out in whole paisa
Advance recoveryThe outstanding advance tracked in another sheetStops at what is still outstanding
Sign-offSignatures on a printoutPM recommends, a senior manager approves, then the figures lock
The booksTyped again by the accountantPosted once to the app's ledger; your accountant still enters it in Tally
05 Nepal rules

Which billing rules are built in?

VAT and TDS are dated settings, retention, advance and LD terms sit on each contract, and every bill keeps the rates it used.

Two engineers measuring a concrete beam with a tape and writing the reading in the measurement book
06 Who uses it

Who works on a running bill?

One bill, three people's sign-off.

An accountant putting ledger binders back on the office shelf at the end of the day
  • Quantity surveyor

    Keeps the MB with the site and prepares each running bill from the signed entries.

    See the role page
  • Project manager

    Checks the billed quantities against the MB and daily reports, then recommends the bill.

    See the role page
  • Accountant

    Sees each certified bill land in the books once, with VAT, TDS and retention on their own accounts.

    See the role page
07 FAQ

Questions people ask

Short answers, about what is built today.

01What is a running bill (IPC) in construction?

A running bill, or interim payment certificate (IPC), is the contractor's bill for the work done so far on a contract. It prices the measured quantity at the contract's BOQ rates, then takes off deductions such as retention, advance recovery and tax. Each bill is certified before it is paid.

02Is the running bill made from the measurement book?

Yes. Once a contract has a measurement book, the running bill takes its quantities only from entries both sides have signed, and typed quantities are refused. Each bill's quantity is the signed total less what earlier bills took, priced at the BOQ rate frozen at award.

03Which deductions does it work out on an IPC?

Price adjustment, VAT, TDS, retention, mobilisation advance recovery and LD. VAT and TDS are worked out on the certified value after price adjustment; retention, advance recovery and LD come off after tax. Every amount is in whole paisa, and each bill keeps the rates it used.

04Are the VAT, TDS and retention rates fixed in the software?

No. VAT and TDS come from dated tax settings, and retention, advance recovery, LD and price adjustment terms are set on each contract. One exception: the 25% price adjustment cap is still fixed in the software. When a rate changes, new bills use the new rate and certified bills keep the one they used. Confirm current rates with your tax adviser.

05Can I enter measurements on the phone?

Not yet. The measurement book is in the web app only. The phone app covers daily reports, attendance, stock checks and approvals, so the site records its work there, and measurement book entries are made and signed on the web.

06Is this retail billing software, or construction billing software for RA bills?

It is construction billing software for contractors. It builds the running account (RA) bill, also called the interim payment certificate (IPC), from measured work. It is not a shop billing app, though a certified bill can become a VAT tax invoice with a gap-free number.

07Does it send bills to CBMS or IRD?

Not yet. From a certified bill you can issue a VAT tax invoice with a gap-free number that cannot be changed afterwards, but sending invoices to CBMS is not live yet; it is coming. Until then, file with IRD the way you do today.

08Does it keep track of variation orders?

Yes. Approved variations add up to a running % of the contract value, and each order records the approval level that share needs. Today the approval itself is a single step by someone allowed to certify bills, not a chain that follows the level.

Something else to ask?

We answer against how your firm works.

Ask us