A store keeper in a cap and safety vest counting stacked cement bags with a clipboard, rebar bundles in front and bricks stacked by the door

Materials & store

Construction inventory management software for sites in Nepal

NepalConstruct tracks cement, rebar, sand and brick from the site's request through the purchase order, goods received note, issue and return. Its stock ledger keeps every entry at weighted average value, the BOQ sets a material budget with a wastage allowance, and a daily stock check from the phone flags any gap for review.

  • Web app
  • Site phone app
  • Nepali and English
Who uses it
Store keepers, PMs, site engineersOwners see the budget and the gaps
The chain
Request to returnRequest, PO, GRN, issue, return
Stock value
Weighted average costEvery entry kept, none deleted
On the phone
Requests and stock checksStock checks save without signal
01 What it does

What does the material management module do?

It is material management software for construction sites. It does the work of the store register, the pile of delivery slips and the month-end sheet that tries to match them. Every movement of stock is an entry, so gaps show while the work is still going on.

01 / 04

From material request to goods received

The site raises a material request and the project manager approves it. Over the BOQ budget, procurement approves too, and above an amount your firm sets the raiser's senior manager signs (the owner, if there is none). A purchase order goes to the supplier, and the goods received note records what arrived. Issues to the work and returns from it are recorded the same way, so every load has a trail.

  • Request, PO, GRN, issue and return in one chain
  • Whoever raised a request can never approve it
  • Requests from the phone; GRNs and issues on the web
02 / 04

A stock ledger that keeps every entry

Every receipt, issue, return and transfer is a new line in the stock ledger. Lines are never edited or deleted: a mistake is fixed with a correcting entry, so the history stays whole. Stock is valued at weighted average cost, and you can see what is left in each store.

  • Valued at weighted average cost
  • A head office store that sends stock to sites
  • Transfers record what arrived short or damaged
03 / 04

A material budget from the BOQ, checked against use

The BOQ take-off sets how much cement, rebar, sand and brick each project should need, plus the wastage allowance your firm sets. Each material shows green, amber or red against its budget. Expected use for the work in the daily reports is compared with what the store issued, and any gap is flagged.

  • Rebar tracked per bar size from the bar bending schedule
  • Expected use against actual issues, gaps flagged
  • Wastage allowance from a dated firm setting
Guide: Cement and rebar reconciliation
04 / 04

A daily stock check from the phone

Each day the site counts what is left, or measures a sand or aggregate pile in metres or feet, and adds live photos and a short video. The check compares the count with the book and flags any gap for review. It saves on the phone without signal and sends later.

  • Counts, and pile measures in metres or feet
  • Live photos and a short video as proof
  • A gap changes stock only after a second person approves it
Guide: Daily progress report format
02 Compared

How is it different from a stock book and Excel?

The same site store, kept two ways.

A site store kept in a paper stock book and an Excel sheet, compared with the same store in NepalConstruct.
TopicStock book and ExcelWritten and totalled by handNepalConstructEach movement is a ledger entry
CorrectionsA line is crossed out or a cell typed overA new correcting entry; the old line stays
Stock valueWorked out by hand at month endWeighted average value on every entry
BOQ budgetThe BOQ quantity sits in a separate fileEach material checked against its BOQ budget, with wastage
ReconciliationA month-end sheet made by handExpected and actual use compared, gaps flagged
Stock countCounted on paper, photos sent on WhatsAppCounted on the phone with photo and video proof, even without signal
ApprovalA signature on the request slipApproved by the project manager, never by the person who asked
03 Step by step

How does material move, from request to count?

Five steps, and each one leaves a record.

  1. 01

    Raise the request

    The site team asks for material for the project, from the web or the phone.

  2. 02

    Get it approved

    The project manager approves it. Over the BOQ budget procurement approves too, and above the amount your firm sets a senior manager signs. Whoever raised it cannot approve it.

  3. 03

    Order and receive

    A purchase order goes to the supplier, or the head office store sends stock. When the load arrives, what came in is recorded.

  4. 04

    Issue and take back

    The store issues material to the work and takes back what is not used. Each movement is a new ledger entry.

  5. 05

    Count and reconcile

    The daily stock check compares what is on site with the book, and expected use is compared with what was issued. Gaps go for review.

04 Where it fits

Where does the store sit in the whole job?

The store sits between the daily site report and the measurement book. Its budget comes from the BOQ in the estimate, and the work in each daily report sets the expected use it is checked against.

Win the work

  1. EstimateBOQ ready
  2. TenderBid submitted
  3. ContractContract signed

Run the site

  1. Daily site reportDPR filed
  2. Materials & storeStock reconciled

Get paid

  1. Measurement bookMB certified
  2. Running billIPC ready to certify
  3. Ledger & reportsBooks balanced
05 Nepal rules

Which store rules does it hold to?

The checks a careful store keeper makes by habit are built into every entry.

An accountant shelving ledger binders in an office at dusk, a laptop and calculator on the desk and a white hard hat on the shelf
  1. Maker is never checker

    Whoever raised a request, or edited it, can never approve it.

  2. Approval by amount

    The project manager approves; over the BOQ budget procurement signs too, and above your firm's amount a senior manager (or the owner, if there is none).

  3. Entries are permanent

    Stock entries cannot be edited or deleted; corrections are new entries.

  4. Weighted average value

    Issues and transfers between stores carry the weighted average cost.

  5. The receiver confirms arrival

    The store that receives a transfer confirms it, with anything short or damaged; the sender cannot.

  6. Wastage as a dated setting

    The wastage allowance comes from a firm setting with an effective date, not a typed number.

    Guide: Cement and rebar reconciliation
06 Who uses it

Who keeps the store running?

The engineer counts, the store keeper records, the manager approves.

A site engineer in a white hard hat and safety vest photographing a newly cast concrete column with a phone, bamboo scaffolding and a building going up behind
  • Store keeper

    Records goods received, issues and returns on the web, and sees stock and goods in transit on the phone.

    See the role page
  • Project manager

    Approves material requests and watches each material against its BOQ budget.

    See the role page
  • Site engineer

    Raises requests from the phone and does the daily stock check with photos.

    See the role page
07 FAQ

Questions people ask

Short answers, about what is built today.

01What is construction inventory management software?

It is software that keeps a construction firm's site stores on record: what was ordered, received, issued to the work and returned, and what each item is worth. NepalConstruct does this from the site's request through the purchase order and goods received note, and checks each material against its BOQ budget.

02Can store keepers record GRNs and issues on the phone?

Not yet. Goods received notes, issues and returns are recorded in the web app today. On the phone, the site raises material requests, sees stock and goods in transit, and does the daily stock check, which also works without signal.

03How does cement and rebar reconciliation work?

The work recorded in the daily reports, multiplied by the norm for each item, gives the material that should have been used. That is compared with what the store actually issued, and any gap is flagged. The budget from the BOQ also shows how much of each material is left.

04Does it track rebar per bar size?

Yes. Rebar is tracked per bar size, and the bar bending schedule (BBS) gives what each size should need. A shortage of 12 mm bars cannot hide inside a steel total that looks fine.

05Does a phone count change the stock by itself?

No. A count or pile measure from the phone is compared with the book, and any gap goes for review. The stock changes only after a second person approves it, so whoever counted cannot also approve the change.

06How is stock valued?

At weighted average cost. Each receipt updates the average rate, and issues and transfers between stores carry that value. Entries are never edited or deleted: a mistake is fixed with a new correcting entry, so the ledger always shows the full history.

07Can head office buy in bulk and send stock to sites?

Yes. The head office store holds company stock that belongs to no project. When it sends a load to a site, the receiving store records what arrived and anything short or damaged, and the sender cannot confirm the arrival on its behalf.

08Is the phone app on Google Play or the App Store?

Not yet. The site phone app is built for Android and iOS, but it is not listed in Google Play or the App Store yet. The web app works today in the browser on a computer or a phone.

Something else to ask?

We answer against how your firm works.

Ask us