Software

How to choose software for a contracting firm in Nepal: Excel, Tally and construction ERP compared, and 12 questions to ask

When choosing software for a Nepali contracting firm, check three things: (1) whether Nepal's rules are built in - the PPMO running-bill order, retention, TDS, SSF, the 13 VAT invoice fields, BS dates; (2) whether site and bill share one set of data - DPR, measurement book and bill linked, working offline; and (3) whether your data stays yours - export, audit trail, coexistence with Tally. Excel and Tally do not do the first two.

Published
Checked against sources
Author
NepalConstruct team, Yoddha Lab
7 min read
Scaffolding on a brick building
Scaffolding on a brick building

An honest comparison of the three options

CapabilityExcelTallyConstruction ERP
BOQ, rate analysisManual, flexibleNoNorms × district rate
Measurement book → running billSeparate files, retypedNoOne set of data, automatic
VAT/TDS/retention/advance orderYour own formulas, easy to get wrongManual vouchersAutomatic from contract settings
DPR, material reconciliationPossible, needs disciplineNoOffline app, automatic comparison
Statutory books, tax returnsNoYes, its core jobJournal export to Tally
Append-only records, audit trailNoPartialYes

The conclusion is simple: Tally does not need replacing; the statutory books are its job. Excel does, because one wrong cell in a running bill costs lakhs and nobody can tell who changed what, when.

Twelve questions to ask a vendor

  1. Show me the running-bill order (VAT → TDS → retention → advance → LD). Is TDS computed on the pre-VAT amount?
  2. When a rule changes (say the advance from 30% to 20%), is it a setting or a new release?
  3. Do old bills keep their old rates?
  4. Can a measurement book entry be deleted? (The answer should be no.)
  5. Can the DPR be filled on a site with no internet?
  6. Is Nepali language and Bikram Sambat date support complete, or only on some screens?
  7. Is SSF computed on basic only, and does it export the SSF schedule format?
  8. Does the VAT invoice carry the 13 fields of Rule 17? Can it connect to CBMS?
  9. Can district rates and norms be stored per fiscal year?
  10. Does all data export (CSV, e-GP format, journals)? What do I get if I leave?
  11. Does it enforce that the maker and the approver are different people?
  12. Pricing in rupees, on what basis: users, projects, or both?

How to compare cost

  • Compare against the cost of one running-bill error (a single digit can be lakhs) and one month of material leakage (Rs 38,000 in the example above), not against the monthly fee.
  • Setup time: it should be possible to configure the firm, a few projects and roles and start estimating the same day.
  • Build one bill from your own contract on demo data; that half hour decides the year.
This guide is written by NepalConstruct, which is itself a product in this market. Put the questions above to any vendor, including us.

Frequently asked questions

How long does it take to move from Tally to a construction ERP?

You do not move; Tally stays. The construction ERP handles site, measurement and billing and sends clean journals to Tally. Setup in a day, the first bill within a week.

Why not foreign software like Procore or Buildertrend?

They lack the PPMO waterfall, SSF, BS dates and Nepali; adapting them to Nepal's law is expensive, and pricing is in dollars.

How NepalConstruct handles this

NepalConstruct was built around the twelve questions above: the PPMO waterfall, an append-only measurement book, a phone DPR whose photos cannot be swapped, attendance and stock checks that work offline, SSF payroll, VAT invoices with gap-free numbers, district rates and norms per fiscal year, and BOQ and report exports. Book a demo, or compare the plans and prices.